Micropac Industries

Quick Facts

Size: 80,000 SF

Location: Garland, TX

Service: MEP Design, Low Voltage, & Fire Protection

Relevant Systems:  Process Gasses (N2, LN2, CDA, Vacuum, DI Water, other cylinder gasses), ISO Class 8 Cleanroom, Emergency Generator

  • Serving the military, aerospace, medical, and industrial markets for over 50 years, this new state-of-the-art facility consolidates 3 manufacturing locations and corporate offices in three phases
  • 100K class clean lab areas with ceiling HEPA filters & humidity controls, for electronic component processing, assembly, and packaging
  • Determine and design process utility requirements coordination of location of central equipment and layout of system distribution to a grid-style ceiling quick-connect system  to allow for flexibility
  • Process utilities include:
    • Centralized Nitrogen (gas)
    • Liquid Nitrogen
    • Compressed air
    • De-ionized water
    • Vacuum
  • Design of IT rooms generator, including location, accessories, and components and associated electrical design
 
 
 

Quick Facts

Size: 350,000 SF

Location: Grapevine, TX

Service: MEP Design, Low Voltage, & Fire Protection

Relevant Systems:  Compressed air plant, process cooling water, electrical power grid, wet pipe sprinkler system

  • Recipient of the 2021 Tilt-up Achievement Award
  • State-of-the-art global headquarters for a trade show display company where exhibits are built out in-house with fabrication areas and a large showroom to simulate arena trade shows. This space also includes an on-site café and modern, casual meeting spaces
  • 185,000 SF two-story new office space and warehouse
  • Designed HVAC systems, diagrammatic duct layouts with coordination of architectural and structural elements
  • Designed and revised ventilation system and heating for warehouse
  • Connection and switching of new lighting fixtures with electrical power plan, including connection of new mechanical equipment
  • Diagrammatic plumbing piping layouts
  • Relocation of electrical room and pump room
  • Sustainable features include water conservation, energy-efficient lighting and HVAC systems, and thermal comfort
 
 
 

The Trade Group

2021 Tilt-up Achievement Award Recipient

Raytheon

Richardson, McKinney, Dallas Love Field, Plano, Spring Creek, and Greenville locations

Quick Facts

Completed over 50 projects

Services: Engineering Design, Building Assessment, Feasibility Studies, Construction Phase Services

Projects Include:

  • SC AMI clean room feasibility study
  • Heat Exchangers
  • AIM-SIL Cleanroom Modifications
  • Building Ventilation
  • Renovation of Legal & Ethics offices suites
  • Vibration Analysis
  • RSS Area 7 Conference Center
  • Vacuum Pumps and Distribution Piping Replacement
  • New Main Entry
  • Immersive Design Center
  • Data Center
  • M1 Executive Offices
  • Multiple Commissioning (Cx) projects
  • A/E services for:
    • airplane hangar
    • parking lot construction
    • design of RSS Area 7 Conference Center and office space
  • EOI Lab
  • DCAA Suites
  • Stinger Lab
  • AHUs Replacement
  • Boiler System Replacement
Relevant Projects:
Raytheon Little Bear
  • MEP Design, programming and construction administration for renovation and repurposing of 9,000 SF production/clean room
  • Facility assessment, hydronic piping, liquid nitrogen distribution, nitrogen gas, compressed air, de-ionized water distribution, power distribution, and lighting for class 100K clean room manufacturing
Focal Plane Array Facility
  • MEP design for a 250,000 SF facility that included new laboratories and cleanrooms for FPA operations,
  • Specific designs for HVAC systems, hoods and acid/caustric/general exhausts, alarms, distribution (of hydrogen, nitrogen, oxygen, compressed air, and carbon dioxide), industrial drains, life safety system
  • Design of process cooling water and deionized water loops
Dallas Love Field
  • MEP Design and construction administration services
  • Replacement of two chillers, chilled water pumps, condenser water pumps, custom air handling units, DDC controls, and instructions to the Contractor to rehab the existing cooling tower
  • Special challenge: limited mechanical room space available and small overhead door access

Quick Facts

Size: 124,000 SF

Services: MEP Design & Fire Protection

Relevant Systems: New compressed air plant, process cooling water, ESFR sprinkler system

  • 3 Phase new building and renovation project that doubled plant size and modernized existing facility
  • Phase I included design & construction of 100,000 SF corporate headquarters and distribution facility
  • Phase II renovated the existing 24,000 SF office building into research and development center
  • Phase III upgraded the existing 100,000 SF manufacturing building to comply with current building, fire, and environmental codes
  • Facility includes:
    • new corporate offices
    • old offices turned into laboratories
    • high bay rack storage with ESFR sprinkler system and a fire pump
    • separate rack storage for combustibles and aerosols in an H3 classified area
    • new shipping/ receiving dock
  • Standby generator provides emergency power required for the H3 ventilation
  • Plant remained in operation throughout renovation with no impact to production

Whitmore Manufacturing

Dallas

511 E. John Carpenter Fwy Suite 250 Irving, TX 75062
T: 214.496.1670

Fort Worth

600 West 6th St Floor 4 Fort Worth, TX 76102
T: 817.962.0336

DBE, SBE, TEXAS HUB CERTIFIED COPYRIGHT ® 2023 B&H ENGINEERS | ALL RIGHTS RESERVED.

Facebook
LinkedIn
Instagram